Gloucestershire Wildlife Trust invest in Solar PV with B-Line Project Services!
B-Line Project Services designed and installed a 10kWp system for one of Gloucestershire Wildlife Trust's working farm. Using SunPower 327W panels for long-life high, quality panel. This was seen by the trust and a means of maximum long-term returns and minimise future costs.
The purpose of the project was to increase the sustainability of the farm by creating a means of producing their own electricity whilst also reducing the farm’s energy costs.
The farm is part of the wildlife trust and does a lot of educational based work with schools and projects locally. The solar PV system is a welcome addition to the farm, adding to the educational resources and future understanding sustainability and renewable energy.