Future Renewable Smart Efficient

Gloucestershire Wildlife Trust invest in Solar PV with B-Line Project Services!

B-Line Project Services designed and installed a 10kWp system for one of Gloucestershire Wildlife Trust's working farm.  Using SunPower 327W panels for long-life high, quality panel.  This was seen by the trust and a means of maximum long-term returns and minimise future costs.

 

The purpose of the project was to increase the sustainability of the farm by creating a means of producing their own electricity whilst also reducing the farm’s energy costs.

 

The farm is part of the wildlife trust and does a lot of educational based work with schools and projects locally. The solar PV system is a welcome addition to the farm, adding to the educational resources and future understanding sustainability and renewable energy.

Html.Partial("~/Views/Partials/OffCanvas/NavigationOffCanvas.cshtml")